Netherton Furniture Warehouse

Click photographs to increase their size.



This project called for the mechanical removal of bitumen bonded granite chippings, from some 450sqm of existing roof. This was followed, by the installation of a ventilated 3-layer high performance torch-on felt system, together with the installation of rubberised plygene valley liners.





netherton pre torch on felting
netherton 2
Netherton03